Manufacturing Time

We strive to stock our standard products including standard size drains and vents.  However at certain points we do have a lead time.  Different product lines have different lead times.

  • Copper Drains 1-2 Days
  • Stainless and Cladded Drains 2-3 Days
  • Vents 4-5 Days
  • Custom Drains/Vents 5-7 Days
  • Edge Metal 1-2 Days
  • Waterjet / Laser / Press Brake 2-5 Days

Depending on work load these lead times can change.  Please contact us for current lead times.

Contact Us

Not finding what you're looking for? Contact Us Directly